Sabtu, 21 April 2012

Lowongan Kerja PT Pertamina Geothermal Energy - Rekrutment Senior Engineer April 2012


www.pge.pertamina.com
PT Pertamina Geothermal Energy - PGE is one of the largest energy company in Indonesia engaged in geothermal energy resources. The Company established in 2006 and as a subsidiary of PT Pertamina ( Persero ) with 90 % shares owned. Other 10 % shares belongs to PT Pertamina Dana Ventura. The Company mandated by the government to develop 15 Geothermal Business Working Areas in Indonesia. The Company focused on activities to increase production in the three operation areas ( Kamojang, Lahendong and Sibayak ). Total products generated from the 3 existing operation areas are 9. 5 million tons of steam with a generation of 1. 3 million MWh.PT Pertamina Geothermal Energy is a subsidiary of state - owned PT Pertamina ( Persero ), which was founded in 2006 to develop a geothermal business in all over Indonesia.
Here are details of the requirements for the above position:
  1. Senior Electrial Engineer (ES)
  2. Senior Mechanical Engineer (MS)
  3. Senior Proces Engineer (PE)
  4. Senior Instrument & Control Engineer (ICE)
  5. Senior Civil Engineer (CE)
  6. Senior Piping Engineer (PIE)
  7. Senior QA/QC Engineer (QE)
General Requirements:
  • Maximum age 45 years
  • Minimum 8 years
  • Kondidi excellent health
  • Fluent communication in English, both spoken and written
  • Computer literate MS Office (including MS Project)
  • Willing to be placed in the field, location: Garut, Tasikmalaya (West Java), and Lahendong (North Sulawesi)
Special Requirements:
  • S1 Education, majoring in Electrical Engineering (ES)
  • S1 Education, majoring in Mechanical Engineering (MS)
  • S1 Education, majoring in Chemical or Mechanical Engineering (PE)
  • S1 Education, majoring in Physics or Electronic Engineering (ICE)
  • S1 Education, majoring in Civil Engineering (CE)
  • S1 Education, majoring in Mechanical Engineering (PIE)
  • S1 Education, majoring in Mechanical (QE)
  • Experience working with at least 200 MW power generation (geothermal power plant, CFPP, or CCPP), with the scope of work: design, O & M, and consultancy
If you are interested in working on the job above and have competence in accordance with job requirements above, please refer to official information the following information below. Only selected candidates will be notified.
official info

Tidak ada komentar:

Posting Komentar